STP Maintenance
- CategoryIndustrial, Residential
- ClientPenjara Malaysia
- Start Date17.12.2020
- End Date20.12.2020
Project Description
Sewerage Treatment Plant (STP) maintenance for Penjara Malaysia focused on supporting reliable wastewater treatment through inspections, cleaning, sludge management, and equipment servicing. The maintenance aimed to maintain treatment performance and identify issues requiring corrective action.
Challenges
Maintenance within a correctional facility requires close coordination with authorised personnel, controlled access, and adherence to security procedures. Work must also be planned to manage wastewater hazards, minimise odours, and maintain essential treatment operations.
Solutions
A coordinated maintenance approach covered inspections of treatment components, cleaning of accessible areas, and servicing of equipment according to site requirements. Operational checks and maintenance records supported the identification of faults, necessary repairs, and future preventive maintenance needs.

